Smack dab in the middle of central Texas lies Blanco County, scene of the state’s rugged Hill Country. West of Austin and north of San Antonio, the county is traversed by the Blanco and the Pedernales Rivers, as well as two major highways: US Highway 290 and US Highway 281.

There is a 15-mile stretch of US Highway 281 that the Texas Department of Transportation (TxDOT) identified for significant maintenance. The target stretch of US 281 connects Marble Falls and Johnson City, a busy section of thoroughfare with approximately 9,000 vehicles traveling daily. It also serves as a north-south connection between San Antonio and Lampasas.

Master everything from OSHA regulations, to high-tech safety equipment in this FREE Special Report: Construction Safety Topics That Can Save Lives. Download it now!

The project section of highway had last received a seal coat surface treatment in 2002. There was a substantial amount of cracking in the existing pavement surface. TxDOT determined that it was time to perform preventative maintenance on US 281 before moisture could get into the base material and cause even further damage, thereby requiring more extensive rehabilitation work.

Clark Construction, based in San Antonio, TX, won the bid for repairing and resurfacing the highway section in Blanco County. This is an approximately $4.7 million project for the company.

Add Grading & Excavation Contractor Weekly to  your newsletter preferences and keep up with the latest articles on grading and excavation: construction equipment, insurance, materials, safety, software, and trucks and trailers.    

“When we first arrived on the site, we ran a profilograph to measure the pavement surface roughness,” states David F. Clark, vice president of Clark Construction. “The profile index was in the 80s and 90s, which confirmed the road was in bad shape and needed complete resurfacing.”

The timetable for completing the project was tight. The company had two months to mill and resurface the road with hot-mix asphalt, so 25 employees were dedicated to the project. Rain delayed the project early on, which created extra pressure to be efficient.

Photo: Roadtec
Roadtec equipment was critical for the repave job on US Highway 281.

Clark Construction used two milling machines to remove the highway’s rough surface. They used a Roadtec RX-700 milling machine from their fleet and acquired a new Roadtec RX-600e milling machine. The RX-700 features a three-track assembly and the RX 600e has a four-track assembly. Both cold planners feature 60-degree conveyor swing, to easily feed a truck, and 14-inch augers.

“We only needed to mill the highway to a 2-inch depth, so our milling machines had more than enough capacity to easily mill the existing asphalt to the required maintenance depth,” says Corey S. Clark, director of asphalt and fleet operations for Clark Construction. “Our local source, Vulcan Materials, recycled the milled material into the asphalt used to repave the roadway.”

The company used two power brooms and a vacuum truck to thoroughly clean the milled surface before paving began.

To ensure that Clark Construction could efficiently place the 2-inches of new asphalt and meet the TxDOT smoothness and rideability specs, the company used its Roadtec SP-200 spray paver. The ride specs were to meet TxDOT surface test type B schedule 3 for smoothness of ride. Additionally, the contractor had to meet density requirements for the material placed.

“The Roadtec SP-200 spray paver has an innovative design that’s been extremely helpful to us,” Corey Clark says. “On previous jobs, we have experienced a significant amount of savings in time, number of employees required, and materials cost.”

Clark Construction had owned the first SP-200 spray paver ever manufactured and recently traded it in for a new machine after putting over 10,000 hours on it.

Differing from a conventional paver, the machine sprays a tack coat seconds before laying the asphalt mix. The tack coat is designed to ensure a good bond to the existing pavement. A 500,000-Btu heater heats the liquid tack in the paver’s 2,100-gallon tank before the paving operation begins.

The liquid oil continuously circulates through the system, and an onboard microprocessor controls the rate of flow to the spray bar. The spray bars extend as needed with the screed, and each nozzle can be manually shut off for partial passes.

The Roadtec SP-200 features a gravity-fed asphalt mix hopper, which has a capacity of 11 tons. The 14-inch by three-quarter-inch spreading augers deliver the mix to the hydraulically extendable, vibrating screed of the Eagle 10.

“This is our second SP-200 paver we’ve owned since 2004,” Corey Clark says, “The big benefit for us is the machine provides superior bonding to the existing pavement. The TxDOT inspectors were impressed to see that within seconds of the oil spray that the asphalt was placed.”

Once the 15-mile stretch of US Highway 281 was completed, Clark Construction ran another profilograph to measure the pavement surface. The second profilograph confirmed the company had achieved the results intended: a measurement of 30.